Before supply
Design decisions are documented and reviewable.
- Survey and requirements record
- Basis of Design and system architecture
- BOQ and technical specifications
- Submittals and system interfaces
We execute routes, racks, terminations and labelling to approved drawings, then hand over test results and as-built records for every link.
Before supply
At handover
TECHNOLOGY & BRANDS
Final selection is based on technical specifications, required approvals and site conditions.
FREQUENTLY ASKED QUESTIONS
The choice depends on bandwidth, distance, electrical interference, PoE demand, pathways and future growth. Fibre is well suited to backbones, longer distances and electrical isolation.
Where included in scope, each point is tested with appropriate certification equipment and issued with a labelled result. Non-compliant links are corrected before handover.
A professional handover should label cables, patch panels, outlets and racks, and update route drawings and schedules to reflect the installed condition.