Systems & Solutions

Cabling infrastructure that is organised, testable and scalable

We execute routes, racks, terminations and labelling to approved drawings, then hand over test results and as-built records for every link.

Before supply

Design decisions are documented and reviewable.

  • Survey and requirements record
  • Basis of Design and system architecture
  • BOQ and technical specifications
  • Submittals and system interfaces

At handover

We test the system as the operations team will use it.

  • Point and scenario tests
  • As-built drawings and clear labelling
  • Configuration backups and operation manuals
  • Training, maintenance and support plan

TECHNOLOGY & BRANDS

Brands available within this system scope.

Final selection is based on technical specifications, required approvals and site conditions.

Structured Cabling

Panduit
SYSTIMAX / CommScope
Nexans
Belden

Racks & Network Rooms

SYSTIMAX / CommScope
Schneider Electric
Panduit
Vertiv

FREQUENTLY ASKED QUESTIONS

Technical answers before survey and delivery.

When should Cat6, Cat6A or fibre be used?

The choice depends on bandwidth, distance, electrical interference, PoE demand, pathways and future growth. Fibre is well suited to backbones, longer distances and electrical isolation.

Is every data outlet tested?

Where included in scope, each point is tested with appropriate certification equipment and issued with a labelled result. Non-compliant links are corrected before handover.

Are labelling and as-built drawings included?

A professional handover should label cables, patch panels, outlets and racks, and update route drawings and schedules to reflect the installed condition.