Before supply
Design decisions are documented and reviewable.
- Survey and requirements record
- Basis of Design and system architecture
- BOQ and technical specifications
- Submittals and system interfaces
We calculate capacity, bandwidth, PoE and growth margins, segment critical traffic and support monitoring and configuration backup.
Before supply
At handover
TECHNOLOGY & BRANDS
Final selection is based on technical specifications, required approvals and site conditions.