Before supply
Design decisions are documented and reviewable.
- Survey and requirements record
- Basis of Design and system architecture
- BOQ and technical specifications
- Submittals and system interfaces
We divide the perimeter into identifiable zones and connect alarms to verification and response procedures that match the site.
Before supply
At handover
TECHNOLOGY & BRANDS
Final selection is based on technical specifications, required approvals and site conditions.