Before supply
Design decisions are documented and reviewable.
- Survey and requirements record
- Basis of Design and system architecture
- BOQ and technical specifications
- Submittals and system interfaces
We define the agent, protected volume, release logic and fire-alarm interfaces around the site risk, equipment and approval requirements.
Before supply
At handover
TECHNOLOGY & BRANDS
Final selection is based on technical specifications, required approvals and site conditions.
FREQUENTLY ASKED QUESTIONS
The decision is based on the hazard, materials, asset value, occupancy, business continuity, code and approval requirements—not on a preferred product alone.
It can be used where the design and applicable standards permit, with correct concentration, hold time, ventilation, pre-discharge warning, release delay and evacuation measures.
Inspection intervals, pressure or weight checks, component life, cylinder testing, recharge availability and spare parts are defined as part of the operating and maintenance strategy.