Before supply
Design decisions are documented and reviewable.
- Survey and requirements record
- Basis of Design and system architecture
- BOQ and technical specifications
- Submittals and system interfaces
We review occupancy, hazards, zoning and required interfaces, then execute functional tests and cause-and-effect scenarios.
Before supply
At handover
TECHNOLOGY & BRANDS
Final selection is based on technical specifications, required approvals and site conditions.
FREQUENTLY ASKED QUESTIONS
Selection starts with occupancy, hazards, ceiling conditions, environmental factors, applicable codes and approvals, followed by zoning, loop capacity and evacuation requirements.
Yes. An approved cause-and-effect matrix defines every response, including plant shutdown, door release, lift recall, voice messages and signals to other systems.
Point, circuit, audible and visual device, battery, interface and cause-and-effect tests are recorded, with observations closed before acceptance.