Before supply
Design decisions are documented and reviewable.
- Survey and requirements record
- Basis of Design and system architecture
- BOQ and technical specifications
- Submittals and system interfaces
We review actual loads, required runtime, installation conditions, bypass and monitoring before selecting UPS topology and capacity.
Before supply
At handover
TECHNOLOGY & BRANDS
Final selection is based on technical specifications, required approvals and site conditions.
FREQUENTLY ASKED QUESTIONS
We measure or confirm connected loads, startup demand, power factor, load criticality, required autonomy and growth, then size the UPS and batteries with an appropriate design margin.
It is preferred for sensitive loads, unstable power environments and applications that cannot tolerate transfer time. Other technologies may suit less critical loads after assessment.
Yes. Maintenance or emergency bypass, battery monitoring, alarms and management-system integration can be included according to load criticality and operational requirements.